Configure hosts and send .mhg (F6)
A successful connection must also be compatible with the current job.
- Open Communication → Host management; enter the site-approved device name, address, TCP port and communication key, then test the connection.
- Finish layout validation and current route generation. Press F6 and select the intended host or compatible hosts.
- Read each host’s head configuration and physical limits. Resolve parameter differences, or renest for the target host before sending.
- Confirm the destination and wait for each saved-job receipt. Verify the file in the main program’s Layout files table.
This website provides instructions only. Carry out every drawing, transfer and machine operation in the installed software. Website links cannot home, jog, start, pause or stop a live machine.