A complete production workflow
Follow the actual connection, referencing, material, task and production states.

- Confirm the motion service, controller and drives are connected and genuinely ready; complete whole-machine homing.
- Set the H1 sheet origin and check sheet dimensions, blade, each head’s Z work point, thickness and validated speed mode.
- Prepare a checked .mhg layout in mCAD, verify receipt, add it to Production tasks and review current planning and estimates.
- Place the material, check the frame if needed, start from the installed program, monitor actual operation and verify the completed count.
This website provides instructions only. Carry out every drawing, transfer and machine operation in the installed software. Website links cannot home, jog, start, pause or stop a live machine.