Arrange and run the production queue
The queue holds repeated machining tasks in the displayed order.
- Drag rows or sort by a table header to establish the desired order before starting.
- Use the task context menu to start from a particular task, process only that task or remove it from the queue.
- Choose Process in list order for unfinished tasks; configured automatic-loading machines show their corresponding automatic-production command.
- On manual loading, after a completed piece, change material and confirm the tools and work area before continuing the next piece.
This website provides instructions only. Carry out every drawing, transfer and machine operation in the installed software. Website links cannot home, jog, start, pause or stop a live machine.